BAUM 20 Pile Feed Folder

BAUM 20 Pile Feed Folder

BAUM 20 Pile Feed Folder

Summary

The BAUM 20 PFF is a heavyduty, highspeed pilefed folding system engineered for commercial printing, direct mail, and finishing operations. It combines a rugged steelframe design with a smooth, quiet helicalgear AC inverter drive capable of folding at speeds up to 8,200 in/min (≈208 m/min), handling sheets from 4″ × 6″ to 20.5″ × 33″. Key productivity features include a 7″ fullcolor touchscreen HMI, the Baum iFold Tutorial system (supporting 30 preprogrammed fold types, 80 job memory and onscreen guidance), and BaumQuick paperless roller gapsets for toolless roller pressure setup. It also includes variable and total batch counting, microadjustable fold plates with metric digital readouts, noncontact pile height sensing, dual front blow bars for sheet separation, and a mobile delivery stacker with adjustable height and extended collection length. The machine offers openaccess feed tables for easy setup and maintenance, realtime diagnostic messaging, and heavyduty removable slitter shafts, making it ideal for highvolume, precision folding applications.

Features

  • New touch Screen control panel
  • NEW Baum ifold tutorial standard
  • NEW BaumQuick paperless roller gapsets
  • New extended mobile delivery stacker
  • New built in Batch Counter with variable batch
  • NEW micro-adjustment on fold plates
  • Exclusive dual front blow bar
  • 1-1/8 inch removable slitters shafts
  • Quiet-positive helical gear drive
  • Non-Contact Pile Height Sensor
  • Combination folding rollers
  • Total Counter
  • Open Access feed Table
  • Diagnostic Message Display
BrochureBrochurePlay Video

OUR PROCESS

Our Easy 5 Steps

Insource Corp was founded on a guiding principle that motivates our team and priorities daily: the customer and their objectives are paramount. We know and believe that if this simple philosophy is adhered to, then all else will align.

Call UsGet A Quote
Westlund Reciprocating Placer
STEP 1

DISCOVERY

Our Solutions Team will walk through a discovery session with your team

baum 20 pile feed folder
STEP 2

ANALYZE AND IDENTIFY

We analyze and identify the best solution(s) to align with your needs and goals

baum 20 pile feed folder
STEP 3

DEMONSTRATION AND PROPOSAL

formax atlas c350
STEP 4

INSTALLATION AND SERVICE

LEARN MORE
baum 20 pile feed folder
STEP 5

PARTNERSHIP FULFILLMENT

HOW CAN WE HELP YOU?

  • This field is for validation purposes and should be left unchanged.